People often blame the manufacturer when there are issues when in fact the problem lies with poor installation.
													
																	Metal door frame installation method statement. 
									
	
		
	
																	2 1 install metal bracing above door frame to secure it metal bracing or door head trimmer must be installed for door opening. 
																	Wood veneer solid hardwood raised panels and stained varnish materials for application. 
																	When repairs are necessary they typically occur in the field at relatively low cost. 
																	All three sides door frames are fitted with a travel spacer bar at the base. 
															
													
									
	
		
	
																	If you choose to install a front door made of steel you will need a helper. 
																	We recommend hiring a licensed contractor or experienced handyman to install the doors we supply as certain applications may prove to be too complex for a novice. 
																	Doors and windows panels shall be delivered to the site fully glazed including hinges locks etc. 
																	The site engineer site supervisor should ensure that the area is ready to install wooden doors and joinery works. 
															
													
									
	
		
	
																	Alternative stiffener for door rectangular hollow section or timber with the same width as the stud to be placed and properly secured as per approved shop drawing and method statement. 
																	Construction world 6 129 views 11 08. 
																	Installation of the hinged door and window leaves on the frames already erected on site shall be as follow. 
																	Installation of wooden doors shall be carried out as per the approved method statement and shop drawing. 
															
													
									
	
		
	
																	Plastering flooring false ceiling and any related works to be completed prior to start fixing of door frames. 
																	Installing an exterior door that is insulated and made of steel can be heavy and cumbersome due to the weight of the materials. 
																	Align the striking plate on the frame matching. 
																	It s essential that doors and frames are installed properly. 
															
													
									
	
		
	
																	Method of statement for wood door installation. 
																	Non fire rated semi solid core wood door. 
																	Approved materials with proper mar and approved shop drawings shall be all available prior to start the work. 
																	This should be removed prior to installation. 
															
													
									
	
		
	
																	Install the frame into the structural opening. 
																	Place the door and window panels in the respective frames hinges. 
																	Steel door and frame installation. 
																	The videos below demonstrate how to install doors and frames the right way. 
															
													
									
	
		
	
																	Wood door installation method of statement includes the following. 
																	Steel doors have a. 
																	Steel doors and frames 101 introduction steel is very strong and in its unaltered state can withstand significant natural and man made abuse. 
																	Fix the handles locks. 
															
													
									
	
		
	
																	Measure both the door and rough opening to make sure the door is the right size. 
																	Properly installed and maintained hollow metal doors often last 30 years or longer. 
																	Installation instructions are provided with most hardware products but not frames and doors as commercial door manufacturers do not provide print instructions with their products.